New prefabricated steel structure factory project

Qingdao Xinguangzheng undertakes structural strength lab, trial rapid – response center and UAV assembly test lab. All installation work were finished within 33 days, including the entry of steel columns on site till the end of the space frame erection!


Post time: Mar-26-2021