• Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building
  • Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building
  • Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building
  • Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building
  • Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building
  • Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building
  • Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building

Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building

  • FOB Price: USD25- 55/ Square meter
  • Min.Order Quantity: 500 square meters
  • Supply Ability: 10000tons per Month

Product description

Our Company

Production process

Project Exhibition

Customer Visiting

FAQ

Package & Transport

Large Span Steel Frame Workshop Design Prefabricated Steel Structure Building

 

Outdoor products Industrial Park project phase II,this is repeat order:

2# steel structure workshop:total building area:40543.53㎡,Building footprint:13546.85㎡。
3# steel structure workshop:total building area:40930.9㎡,Building footprint:13947.7㎡,three floors above ground,Part auxiliary building,building height:21.020m,parapet wall height:21.950m。The structural type is steel frame structure.

Our group factory has been specialized in all kinds of steel structure buildings for 25 years,untill now have already been exported to about 80 countries all over the world,we have professional engineering team,production system,construction department,so we can provide very excellent one-stop service,you will satisfy with our quality,profession,price and after service very well!

If you have any requirements about prefabricated steel structure buildings,kindly pls feel free to contact with me:

***Whatsapp:0086 13793251081
***Email:gloria@steelstructurechina.com
#steel structure#steel structure workshop#steel structure warehouse#steel structure building#prefabricated steel structure building#PEB steel structure building#steel structure hanger#steel structure shed#multi-storey steel structure office building#construction#contractor#consultant

1719390569018_副本 1719390559173 (2)_副本 1719390546902 (2)_副本 1719390517376_副本 1719390495480 (2)_副本 1719390480260 (2)_副本 1719390578849 (2)_副本

● Primary Framing Elements

Columns, beams members are made by welded H section steel, which will be easily bolted together at site. A factory primer and facing paintings or galvanization surface treatment are applied to get better anti-rusting effect of primary framing elements.The most important step before painting is shot blasting and rust removal.

● Secondary Framing Elements

Purlin, tie bar are formed as secondary framing, which will fix on columns and beams by common bolts.

● Bracing

Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural building.

● Cladding

Roof and Wall are covered by galvanized color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of structural building to protect it against bad weather or to make it look more attractive and last for generations.

● Windows and Doors

Aluminium-alloy Window; Sliding Door/Folding Door/Electric roller shutter door..

● Other Options:

Gutter, Downpipe, Transparent sheet, Ventilator and Bridge Crane will be fitted according to client’s requirements.

Product description:

project name Steel Structure Building For Water Plant in Ethiopia
material grade Q355B / Q235B
surface treatment two-coats of mid-grey paint or hot-dipped zinc as per the clients’ requirements
building size as per customers’ requirements
roof and wall galvanized color steel sheet or aluminized zinc coating color steel sheet or sandwich panel
insulation material glass fiber,rock wool or PU
usage workshop,warehouse,storage,shed,hanger,office,supermarket,exhibition hall,hotel,
type Pre-engineering steel structure building/prefabricated steel structure building/prefab steel structure building/PEB 
material of window & door Aluminium-alloy window,sliding door,electric roller shutter door or as per customers’ requirements
brand name XGZ
building life time 50 years
place of origin China

基础框架中英文

Why choose our factory as long terms supplier?

Because:

1.Our factory’s philosophy is to fucus on all customers’ satisfaction.

2.Our work target of service customers is to obtain repeat orders and come to long terms win-win cooperation with all our customers.

3.Our factory has been specialized in all kinds of steel structure buildings for 27 years in China,and exported to about 80 countries all over the world,we have strong engineers team,fabrication teams and construction teams,so we can provide excellent one-stop service,you will satisfy with our quality,price and service,tks.