Total building area 3578.38 square meter, 200 steel columns, 55 integrated floor slab, main construction completed in five days.
Advantages of steel structure building:
1. The total weight of the building is light: about half of the concrete structure weight, which can r...
Hisense Logistics Park was located in Qingdao, Shandong Province, China.
It is one of the three characterics industrial parks in Pingdu with an output value of more than 20 billion yuan.
The first phase and the second phase project have a total area of 140,000 m2.
The first phase of the project, ...